Simultaneity N with Volatility M

The coordination mechanism for this dependency is almost similar to that of simultaneity N, just adding place Pm regarding the volatility and respective timeouts. Figure 40 shows this model for N = 2 and M = 4. It is important to note that M is the number of times the resource is going to be used, and not the number of groups of N tasks that is going to use it.

Figure 40: Simultaneity 2 + Volatility 4.

The same comparison can be made for high level PNs. The model is similar to that of simultaneity N, adding place Pm.

<< Back